D E & F - E N G I N E E R I N G

Please Wait For Loading

16 Lime Street, Belmopan, Cayo District (+501) 610-2564 info@defengineering.bz

SJ Air Service Ltd: Civil Engineering

    You Are Currently Here!
  • Home
  • Portfolio SJ Air Service Ltd: Civil Engineering

Project Information

  • Project Name : Proposed Hanger Design for SJ’s Air Services Ltd, San Pedro Town, Belize C.A.
  • Category : Civil Design
  • Client : SJ Air Service Ltd
  • Contract Date : March 13, 2022
  • Summary of Services: D E & F Engineering Limited providing design and engineering drawing for the client for an airplane hangar complete with office, bathroom and other accessories.

SJ Air Service Ltd: Civil Engineering

DE&F Engineering Limited is tasked with creating a comprehensive design and engineering blueprint for an airplane hangar, complete with an integrated office space, bathroom, and other essential amenities. This project aims to develop a functional, secure, and efficient hangar that meets the specific needs of the client, including aircraft storage, maintenance, and administrative operations. The hangar’s design will reflect modern architectural principles while ensuring practicality and safety in its day-to-day use.

Project Challenge
The primary challenge in this project involves designing a spacious hangar that can accommodate various types of aircraft while integrating office space and other amenities cohesively. The structure must withstand diverse weather conditions, including strong winds and potential seismic activity, ensuring the safety of both the aircraft and personnel. Efficient use of space, ensuring easy access and movement within the hangar, and compliance with aviation industry standards and local building codes are additional critical factors. The project also demands an aesthetically pleasing design that aligns with the client’s corporate image.

Project Solution
To address these challenges, DE&F Engineering will leverage advanced engineering techniques and durable materials suitable for aviation facilities. The design will feature a high-ceiling, clear-span structure to accommodate different aircraft sizes without internal obstructions. Special attention will be given to the hangar’s doors, ensuring they are robust yet easy to operate. The integration of office space and other amenities will be planned to maximize efficiency and comfort while ensuring they are easily accessible yet separate from the hangar’s primary operational area. The use of energy-efficient materials and systems will be a priority, aiming to reduce operational costs and environmental impact. By focusing on functionality, safety, and sustainability, DE&F Engineering aims to deliver a state-of-the-art airplane hangar that meets all the client’s needs and exceeds their expectations.