Project Information

  • Project Name : Engineering Design and Calculation for a scaffolding walkway to be erected along the Heritage Jetty
  • Category : Civil Design
  • Client : SMTL
  • Contract Date : January 18, 2023
  • Summary of Services : D E & F Engineering Limited providing engineering and live load calculation for the scaffold walkway

SMTL: Civil Design Project

Project Description
This project involves the design and calculation of a robust scaffolding walkway to be erected alongside the Heritage Jetty. The walkway aims to provide safe, reliable, and accessible passage for pedestrians and workers while maintaining the aesthetic integrity of the jetty. The scaffolding system will be engineered to handle environmental factors, such as coastal weather conditions, and heavy foot traffic, ensuring durability and stability.

Project Challenge
One of the main challenges of this project is to design a scaffolding structure that can withstand the harsh coastal environment, including high winds, saltwater corrosion, and varying weather conditions. Additionally, ensuring minimal disruption to the daily activities around the Heritage Jetty, while maintaining safety and accessibility standards, presents a logistical challenge. Balancing the structural integrity, safety requirements, and aesthetic considerations, particularly in a heritage-sensitive area, also adds complexity to the project.

Project Solution
To address these challenges, DE&F Engineering will employ innovative design techniques and materials resistant to corrosion and environmental wear. The walkway design will incorporate lightweight, yet strong materials to ensure ease of assembly and disassembly, while providing the necessary support and stability. Advanced CAD modeling and structural analysis will be used to optimize the design for safety and durability. The project plan will include a phased construction approach to minimize disruption, ensuring continuous access and safety for all jetty users. Special attention will be given to the aesthetic aspect, ensuring that the scaffolding complements the heritage environment of the jetty.